AN 307: Intel® FPGA Design Flow for AMD* Xilinx* Users

ID 683562
Date 9/08/2023
Public

A newer version of this document is available. Customers should click here to go to the newest version.

Document Table of Contents

3.3.16.2. Engineering Change Order (ECO) Flow

The Xilinx Vivado Engineering Change Order (ECO) flow allows you to modify a post-implementation design and generate reports and programming files.

Intel® Quartus® Prime Pro Edition has an ECO Compilation Flow that supports last-minute, targeted design changes including changing routing connections; changing IOPLL frequencies by modifying the input reference clock frequency; modifying LUT masks; I/O pin settings such as slew rate, current strength, and delay chain; creating, removing, or placing individual nodes; and inserting wireluts.